Offsite manufacturing

Made offsite, assembled on site, delivering faster programmes, consistent quality and far less site waste.

70% Less waste when compared to a traditional build.
Up to 20% Cost savings over traditional build methods.
Up to 50% Faster programmes.

One team, from concept to completion

Bringing design and construction together under one accountable team removes the gaps where cost and risk usually hide. We plan, price and build as one, so decisions are made early and certainty is built in from the start.

A shorter programme

Factory and site work run at the same time. The client occupies sooner, and the contractor spends less time exposed to site risk and preliminaries.

Consistent quality

Components are made in controlled conditions, unaffected by weather. The client gets fewer defects and the contractor does less rework.

Safer sites

Less work at height, less heavy lifting and fewer trades on site reduce risk for everyone involved.

Less waste and disruption

The client moves closer to sustainability targets. The contractor runs a cleaner, less congested site with simpler logistics.

Offsite manufacturing
Offsite manufacturing
Offsite manufacturing
Offsite manufacturing

One team, from concept to completion

Offsite manufacturing

Bringing design and construction together under one accountable team removes the gaps where cost and risk usually hide. We plan, price and build as one, so decisions are made early and certainty is built in from the start.